The new CO2 capture plant at the Faenza site is fully operational.
This plant closes a perfect circle that involves the recovery of waste from the agri-food chain and its use for the production of biogas within the biodigesters: thanks to the plant opening in 2019, this biogas is purified and becomes advanced biomethane for automotive fuel, while the residual mass is used to produce compost.
Instead of being released directly into the atmosphere, the CO2produced during these operations is captured by the new plant and stored to be resold as a high-value product.
The next step in the circular story of Caviro Extra, which we wanted to present with a video.